NEW QUESTION 15
Your customer wants a projectstart date to cascade to the project tasks but does not want the finish date to be cascaded. Identify the default setup in a project template that can be used to enable this.(Choose the best answer.)
- A. Do not cascadedate changes.
- B. Cascade change to the start date and the finish date.
- C. Cascade change to the finish date.
- D. Cascade change to the start date.
Answer: D
Explanation:
Explanation
Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-control-config Topic - Project Date Cascade Options Use the Cascade option choice list to determine whether your changes to project dates cascade to tasks.
Use the Basic Information region on the Edit Project Template page to select one of the following options:
* Do not cascade project date changes to tasks: Both start and finish dates are editable. However, you must ensure the following:
* The project start date is not later than the earliest task date.
* The project finish date is not earlier than the latest task date.
* Cascade project start date change to affected tasks: You can edit only the project start date.
* Cascade project finish date change to affected tasks: You can edit only the project finish date.
Do not cascade project date changes to tasks is the default value. You must select the cascade option each time you change the project dates, as your selection isn't saved for future date changes.
If you select to roll up planned dates for tasks or are using an external application for scheduling, then you can't modify the project start or finish dates.
NEW QUESTION 16
Your customer wants to generate accounting based on project information associated with the transaction for all subledger transactions. Identify three subledger applications for which the project source is available for deriving accounts when configuring subledger accounting. (Choose three.)
- A. Purchasing
- B. Receipt Accounting
- C. Fixed Asset
- D. Payables
Answer: A,B,D
Explanation:
Explanation
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-costing-configuratio Topic - Deriving Projects-Related Accounts
NEW QUESTION 17
Your organization has been using project class categories and codes for reporting purposes and is set up at the project level. You recently defined a new project type, Capital-Contract, and created new class categories named Build, Operate, and Transfer (BOT) and Build, Transfer, and Maintain (BTM), with class codes of Yes/No. But on creation of a project, you are unable to associate these classcategories and codes.
Identify two setups that are mandatory for these class categories and codes to be displayed. (Choose two.)
- A. Class categoriesshould beassignedtoproject type.
- B. Class codes should be assigned to project unit.
- C. Class categories should be assigned to business unit.
- D. Class codesshould beassociated
Answer: A,D
Explanation:
Explanation
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-foundation-configura Topic - Associating Project Types and Class Categories: Examples Project classifications group your projects according to categories and codes that you define. When you associate project classifications with project types, the classification is available for selection on projects with that project type.
Use any ofthe following methods to associate class categories with project types:
* Add a classification to the project type definition
For each classification that you associate with the project type, you can enable the Assign to All Projects option to automaticallyadd the classification to the project definition for all new projects with the project type.When this option is enabled, all projects with this project type must be assigned a class code for the class category.
* Add a project type to the class category definition
* Enable the Assign to all Project Types option on the class category definition
NEW QUESTION 18
You are managing a project based on a Waterfall model. You define a project and a project plan in Oracle Project Portfolio Management with tasks and subtasks applicable to each of the phases of the project:
Initiation, Discovery, Design, Build, Test, and Deploy. As a project manager, you want todefine deliverables for your project requirementsthat are elucidated during the Discovery phase of your project. You now want to understand how the inheritance between requirements, tasks, and deliverables works. Identify the two correct statements in this respect. (Choose two.)
- A. Youassociate a deliverable with a task, independent of associating a requirement with a task.
- B. The association of a deliverable with a task is dependent on associating a requirement with a task.
- C. A deliverable associated with a requirement is not automatically associated with the tasks created for that requirement.
- D. A deliverable associated with a requirement is automatically associated with the tasks createdfor that requirement.
Answer: A,C
Explanation:
Explanation
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapem/define-project-deliverables.
Associate deliverables with one or many tasks or requirements at any level. Associate existing deliverables to tasks or requirements or create deliverables directly for tasks or requirements. You can delete a deliverable in New status if it is not associated with tasks or requirements.
Can deliverables for projects and tasks be inherited from associated requirements?
No.A deliverable associated with a requirement is not automatically associated with the tasks created for that requirement.
You associate a deliverable with a task, independent of associating a requirement with a task.
NEW QUESTION 19
You are set up as a Follower in Manage Tasks. Which two abilities can you accomplish? (Choose two.)
- A. Enter progress for tasks.
- B. Receive email notifications about changes that team members make to a task.
- C. View task details and the task activity stream.
- D. Edit task details.
Answer: B,C
Explanation:
Explanation
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapem/execute-project-tasks-and-d Followers are persons who aren't working on the task but have an interest in reviewing the task progress. Only the resources and other followers can add followers to a task. If a resource assigns the task to another team member, the application automatically changes the original resource to a follower.
What's the difference between my tasks and tasks that I follow?
* You can edit task details and enter progress for your tasks on the Manage Tasks page. If a task has multiple resources, only theprimary resource can edit the task.
* When you follow a task, you can view the task details and see the task activity stream. You receive e-mail notifications of changes that team members make to the task.
* If a resource reassigns the task to another team member, then the previous resource automatically becomes a follower.
NEW QUESTION 20
You want to export your project plan to Oracle Project Financial Management Cloud after initial scheduling is complete in MicrosoftProjects. Identify three conditions that must be met forexporting milestone tasks.( Choose three.)
- A. only one labor resource assignment with 0 effort
- B. lowest-level tasks set up with zero duration
- C. percent work complete values of 0 or 100 percent
- D. only one labor resource assignment with 100 effort
- E. lowest-level tasks set up with non-zero duration
Answer: A,B,C
Explanation:
Explanation
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapex/define-project-management- Topic - Microsoft Project Prevalidation: Explained The following table describes Prevalidation rules for tasks and resource assignments.
Level
Rule
Lowest-level tasks
One labor and multiple expenseresources are allowed for a lowest-level task. Remove other resources.
Summary tasks
Only one labor resource with zero allocation is allowed for a summary task. Remove all other resources.
Milestone tasks
No subtasks are allowed under milestone tasks. Milestones must be lowest-level tasks.
Milestone tasks
Milestone tasks must have zero duration.
Milestone tasks
Only one labor resource, with zero effort, is allowed for a milestone task. Remove all other resources.
When exporting milestone tasks,ensure that the tasks:
* Are lowest-levels task with zero duration, that is, the same start and finish dates.
* Have only one labor resource assignment with zero effort.
* Have percent work complete values of 0 or 100 percent. Any other values are set to zerobefore export.
NEW QUESTION 21
Which application generates external roles to grant both function and data security? (Choose the best answer
.)
- A. Functional Setup Manager
- B. Oracle Identity Manager
- C. Authorization Policy Manager
- D. Business Process Manager
Answer: B
Explanation:
Explanation
Authorization Policy Manager (APM)
APM greatly simplifies the creation, configuration, and administrationof application policies APMdoes not support the management of users and external roles;these artifacts can only be viewed with the tool.Their provision and management is typically accomplished using Oracle Identity Manager Oracle Identity Manager (OIM) In regard to enterprise users and external roles, Authorization Policy Manager provides viewing and searching functionality only.To manage users and external roles, use Oracle Identity Manager or some other identity management tool.
OIM provision users,roles, and defines what a user can do in Oracle Cloud Duty Roles are mapped to jobs and assigned access privileges (Data Security)
NEW QUESTION 22
Your customer complains that their project resources do not report their time promptly, which has resulted in incorrect reporting of project performance. What should you do to fix this problem? (Choose the best answer.)
- A. Enable track missing time at
- B. Enable track missing time atbusiness unit.
- C. Enable track missing time at project template.
- D. Enable track missing time at project type.
Answer: A
NEW QUESTION 23
You have a billable project for which the following details are provided:
Associated Inception-To-Date (ITD) Project Actual Cost: USD 60
AssociatedProject Budgeted Cost: USD 300
Contract Amount: USD 1000
Project Funded Amount: USD 750
Sum of Existing Revenue Events: USD 80
Identify the Associated Project Spent revenue that will get generated based on the preceding details. (Choose the best answer.)
- A. USD 134
- B. USD 120
- C. USD 184
- D. USD 70
Answer: D
Explanation:
Explanation
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjb/manage-project-contract-reve Associated Project Percent Spent Example The following formula calculates the percent spent revenue for the associated project.
((Sum of ITD Actual Cost for every subtask that is part of the associated task/Sum of Total Budgeted cost for every task that is part of associated task) xAssociatedProject Funded Amount) - Sum of Existing Invoice Event Amounts for the Associated Project ((60/300) x750) - 80 =70 ((Actual Cost / Budgeted Cost) x Budgeted Revenue) - Sum of Revenue Event Amount
NEW QUESTION 24
You recently made some changes to a project contract and the current status of the contract is Under Amendment. Identify the correct sequence of activities that can take place on that contract. (Choose the best answer.)
- A. OnHold > Pending Acceptance > Active
- B. On Hold > Pending Approval > Active
- C. Pending Approval > Pending Acceptance > Active
- D. Pending Acceptance > Pending Approval > Active
Answer: C
Explanation:
Explanation
Reference: https://docs.oracle.com/cloud/latest/common/FASCC/FASCC1124283.htm Topic -Contract Actions and Status Changes: Explained
NEW QUESTION 25
You search for resources to fulfill a project resource request but are unable to proceed after receiving the following error message: "Thesearch for resources cannot be completed because the project resource search index is not available. Contact your help desk." Identify the cause for this error message. (Choose the best answer.)
- A. The index is not in the process.
- B. The index has been built.
- C. The most recent update of the index finished successfully.
- D. The index is in the process of being updated.
Answer: D
Explanation:
Explanation
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/fapfm/implementing-project-execut Topic - Submitting the Process to Maintain Project Resource Search Index: Procedure Submit the Maintain Project Resource Search Index job set to update the resources that appear on the Search and Evaluate Resources page when a resource manager searches for resources to fulfill project resource requests. The job set consists of a set of processes that facilitate efficient and rapid searches for qualified resources.
Resource managers can't searchfor resources or view resource details if the search index isn't available for a project resource request with qualifications or keywords. For project resource requests without qualifications and keywords, resource managers can search for and evaluate resources based on resource availability even if the search index isn't current or available.
Caution:The search index isn't available if the Maintain Project Resource Search Indexjob set process fails, or while the process is running.
NEW QUESTION 26
Your organization has been awarded a new contract based on which you are allowedto sell:
* Items not tracked in inventory
* Inventory items
* Services
Which contract structure would fulfill your requirement of item sales? (Choose the best answer.)
- A. Create two contract lines with a line type each of "sell intent, item, project-based' and "subscription, project-based, sell".
- B. Create two contract lines with a line type each of "product, project-based, sell agreement, standalone" and "sell intent, item, project-based".
- C. Create two contract lines with a line type each of "free-form, project-based buy agreement" and "bundle sell, project-based".
- D. Create two contract lines with a line type each of "sell intent, free-form, project-based" and "sell intent, item, project-based
Answer: D
NEW QUESTION 27
As you go through the first-quarter close for your customer, you notice that the burden amounts calculated do not seem to be right. Based on the calculations, you notice that the amounts calculated are not considering the burden schedule override at a task level, which was done during the second month of the quarter. Identify the reason for this problem. (Choose the best answer.)
- A. Only new expenditure items charged to the task use the new burden schedule; expenditure itemsprocessed earlier cannot be reprocessed.
- B. All expenditure items charged to the task use the new burden schedule.
- C. You can enable automatic reprocessing of expenditureitems processed before the burden schedule change.
- D. Only new expenditure items charged to the task use the new burden schedule; expenditure items processed earlier can be manually marked for reprocessing.
Answer: D
Explanation:
Explanation
Reference: https://docs.oracle.com/cloud/r13_update17b/projectcs_gs/OAPJC/OAPJC1071490.htm#OAPJC10714
NEW QUESTION 28
You are implementing Project Portfolio Management (PPM) for a professional services firm. The firm rents multiple buildings for its operations. At the end of each month, they reviewthe rent expense for the month and want to allocate the rental cost to all the projects and tasks that are executed by associates in each of the buildings. The source amounts must be proportionally allocated to the tasks based on the raw costs of the tasks from the previous month. Considering that all these costs are in General Ledger, what three allocation setups should you complete in PPM? (Choose three.)
- A. Allocate rental costs once each accounting period by using the "spread evenly" allocation method.
- B. Define allocationbasis by using Actual Amounts with aperiod-to-date amount class.
- C. Allocate to all eligible tasks and prorate the allocation by thetotal actual raw costaccrued for each task during theprevious accounting period.
- D. Allocate rental costs once each accounting period by using the"full" allocation method.
- E. Define allocation basis by using Actual Amounts with a project-to-date amount class.
Answer: B,C,D
NEW QUESTION 29
Your client is involved in automation control systems installation. Over the years, they have analyzed their total project spend on specific resource classes. They have identified that their cost spread distribution factor on a 10 spread point scale resembles:
0-4-10-11-14-13-10-4-0-0. Identify two ways to handle this kind of a spread on their budgets and forecasts. ( Choose two)
- A. Use the predefined Bell Curve spread with small deviations on the spread points.
- B. Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to the resource class.
- C. Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to a project template.
- D. Use the predefined S-Curve spread with small deviations on the spread points.
Answer: A,B
NEW QUESTION 30
You want tocreate a few project roles so as to restrict accessin the Project Financial Management work area to only the specific projects in which an employee is assigned as a team member. What are the two default project roles available to meet this requirement? (
- A. Project Billing Specialist- Security based on Contract BU
- B. Project Manager- Security based on Project Assignment
- C. Project Accountant- Security based on BU for Assets, Expenditure BU for Costs and Contract BU for Revenue
- D. Project Executive- Security basedon Project Hierarchy
- E. Project Team Member- Security based on Project Assignment
Answer: B,E
NEW QUESTION 31
In a Project Draft Invoice preview, quantity (hours) andunit price (bill rate) are shown as fields on the invoice.
Quantity and unit price are then used to calculate the line total, then the total price of the invoice. After the invoice is transferred or created in Receivables, the invoice detail has a quantityof 1, and a unit price equal to the line total. The detailed Unit Price/Quantity does not come through on the Receivables invoice.
Identify the correct statement about details in the receivables invoice. (Choose the best answer.)
- A. The project sends only the invoice header to Receivables, not the invoice line description and distributions.
- B. The project sendsonly the invoice header and invoice line description to Receivables, not the invoice distributions.
- C. The project sends the invoice header, invoice line description, and the invoice distributions to Receivables.
- D. The project sends the invoice line description and the invoice distributions to Receivables, but not the invoice header.
Answer: C
NEW QUESTION 32
Your administrator creates maintenance conditions on the Maintain Project Enterprise Labor Resources page.
An HCM person is included in a condition with a process ordervalue of 1 and, additionally, there are three other conditions, all with a process order value of 10. Identify two correct statements about the Maintain Project Enterprise Labor Resources process as it relates to process order values. (Choose two.)
- A. The process creates a resource by using the condition with a process order value of 1 but does not create more than one resource for the same person even if subsequent conditions apply to the person.
- B. The process creates a resource by using the conditions with a process order value of 10 but does not create more than one resource for the same person even if subsequent conditions apply to the person.
- C. For the three conditions that have the same process order value of 10, the records are processed in ascending numeric order based on the condition name.
- D. For the three conditions that have the same process order value of 10, the records are processed in ascending alphabetic orderbased on the condition name.
Answer: A,D
NEW QUESTION 33
Identify two correct role templates available on the Oracle Entitlement Server to generate roles for Project Organization Security. (Choose two.)
- A. Project Accountant Template for Project Organization Security
- B. Project Administrator Template forProject Organization Security
- C. Project Creator Template for Project Organization Security
- D. Project Manager Template for Project Organization Security
- E. Project Billing Specialist Template for Project Organization Security
Answer: B,C
Explanation:
Reference: https://docs.oracle.com/en/cloud/saas/applications-common/r13-update17d/faser/implementing-securit Ref to "Securing Project Financial Management and Grants Management Applications" Table lists predefined enterprise roles and the type of security that grants the role access to data in a work area or dashboard.
Enterprise Role
Work Area orDashboard
Data Security Based On
Project Accountant
Asset
Project business unit
Project Accountant
Costs
Project expenditure business unit
Project Accountant
Revenue
Contract business unit
Project Administrator
Project Financial Management
Projectbusiness unit
Project organization
Project Billing Specialist
Invoices
Contract business unit
Project Creator
Project Financial Management
Project business unit
Project organization
Project Management Duty
Project Management Infolet Dashboard
Projectassignment
Project Management Duty
Project Performance Dashboard
Project assignment
Project Manager
Project Management Infolet Dashboard
Project assignment
Project Manager
Project Performance Dashboard
Project assignment
Project Manager
ProjectManagement
Project assignment
Project Manager
Project Manager Dashboard
Project assignment
Project Team Member
Project Financial Management
Project assignment
Grants Accountant
Invoices
Contract business unit
Grants Accountant
Revenue
Contract businessunit
Grants Administrator
Awards
Contract business unit
Grants Administrator
Contracts
Contract business unit
Grants Administrator
Project Financial Management
Project business unit
Principal Investigator
Awards
Award assignment
PrincipalInvestigator
Contracts
Award assignment
Principal Investigator
Project Financial Management
Project assignment
NEW QUESTION 34
Your company uses an accounting calendar with periods that are identical to calendar months. A contract resource has been identified to work for six months on an accountingclose cycle project. The resource is planned to start with 10 days left in the first period and to end 20 days into the last period. For the remaining periods, the resource must be loaded on all working days of the month. You are required to distribute the budget, forecast, and planning amounts across periods based on the task duration.
Which predefined spread curve must be used to meet this requirement? (Choose the best answer.)
- A. Even
- B. Back Loaded
- C. Daily Spread Basis
- D. S-Curve
- E. Bell Curve
Answer: C
Explanation:
Explanation
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-control-configuration Predefined Spread Curves Name Description Dist. Factors Even Linear distribution of financial orproject plan values across periods.
10-10-10-10-10-10-10-10-10-10
Prorated Even
Linear distribution of financial or project plan values across periods, with an exception of the first period and last period in the financial plan. Financial or project planvalues for the first period and last period are prorated based on the number of days in the period.
10-10-10-10-10-10-10-10-10-10
Back Loaded
Back-loaded distribution of financial or project plan values across periods. Assigned amounts increase over succeeding periods.
0-5-10-15-20-25-30-35-40-45
Front Loaded
Front-loaded distribution of financial or project plan values across periods. Assigned amounts decrease over succeeding periods.
45-40-35-30-25-20-15-10-5-0
S Curve
S-shaped distribution of financial or project plan values across periods.
18-10-8-10-15-17-18-17-15-8
Bell Curve
Bell-shaped distribution of financial or project plan values across periods. Assignment of plan values is highest in the middle periods.
0-4-10-12-14-12-10-4-0-0
Daily SpreadAnalysis
Spread is based upon the number of days in each financial period throughout the duration of the task assignment. Amounts are proportionally distributed throughout all periods for the duration of the task assignment None
NEW QUESTION 35
Identify three correct statements about the integration of Primavera P6 Enterprise Project Portfolio Management and Oracle Project Portfolio Management Cloud. (Choose three.)
- A. Event completion flowsfrom Primavera P6 Enterprise Project Portfolio Management to Oracle Project Portfolio Management Cloud.
- B. Projects and task definitions flowfrom Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
- C. Billing events flow from Primavera P6 Enterprise Project Portfolio Management to Oracle Project Portfolio Management Cloud.
- D. Project plans and progress flow from Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
- E. Summarized actual quantity and cost flowfrom Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
Answer: A,B,E
Explanation:
Explanation
Ref:https://docs.oracle.com/cd/E48434_01/fusionapps.1118/e49622/F1125394AN6D254.htm Primavera P6 Enterprise Project Portfolio Management and Oracle Fusion ProjectPortfolio Management: How They Work Together Use Oracle Fusion Project Integration Gateway to integrate Oracle Fusion Project Portfolio Management with Primavera P6 Enterprise Project Portfolio Management. The integration enables project accountants, project billing specialists, and executives to centrallyperform project costing, billing, accounting, and executive reporting tasksin Oracle FusionProject Portfolio Managementwhileenabling each project manager to perform detailed project planning andscheduling in Primavera P6Enterprise Project Portfolio Management.
Oracle Fusion Project Integration Gateway ensures data security, integrity, and efficiency by defining a set framework in which data is exported from and imported into Oracle Fusion Project Portfolio Management.
The following table and diagram provide an overview of the flow of information.
Information Type
From Application
To Application
Global integration information
Oracle Fusion Project Portfolio Management
Primavera P6 EnterpriseProject Portfolio Management
Projects and task definition
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise Project Portfolio Management
Summarized project actual quantity and cost
Oracle Fusion Project Portfolio Management
Primavera P6Enterprise Project Portfolio Management
Project plans and progress
Primavera P6 Enterprise Project Portfolio Management
Oracle Fusion Project Portfolio Management
Billing events
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise ProjectPortfolio Management
Event completion
Primavera P6 Enterprise Project Portfolio Management
Oracle Fusion Project Portfolio Management
NEW QUESTION 36
Which two statements are true about a project in "Draft" status? (Choose two.)
- A. Team members can see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
- B. Team members cannot see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
- C. Project managers can view draft projects on the Project Manager Dashboard and use the projects for requirements planning.
- D. Project managers can neither view draft projects on the Project Manager Dashboard nor use the projects for requirements planning.
Answer: B,C
Explanation:
Explanation
Reference: https://docs.oracle.com/cloud/latest/projectcs_gs/OAPEM/OAPEM1122096.htm The following table lists the project statuses and what you can do with projects in that status.
Project Status
What you can do?
Draft
* Project managers can view draft projects in the Project Manager Dashboard and use the projects for requirements planning.
* Team members can't see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
Active
* Project managers can view active projects in the Project Manager Dashboard and use the projects for requirements planning, project execution, and reporting.
* Team members can view task assignments on active projects on the Team Member Dashboard and My Work area.
Pending Close
* Project managers can view pending projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
* Team members can view task assignments on pending projects on the Team Member Dashboard and My Work area.
Submitted
* Project managers can view submitted projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
* Team members can view task assignments on submitted projects on the Team Member Dashboard and My Work area Closed
* Project managers can't view closed projects in the Project Manager Dashboard or use the projects for requirements planning, project execution, and reporting.
* Team members can't view tasks of closed projects on the Team Member Dashboard or in the My Work area.
NEW QUESTION 37
When implementing Project Performance Reporting, your customer has the following requirements:
* Every time a project cost is greater than or equal to a threshold, then the project should be shown as critical.
* As long as a project cost is less than the threshold, the project should be shown as on-track.
Which threshold levelrule is ideal for this kind of KPI definition? (Choose the best answer.)
- A. multiple threshold levels
- B. multiple threshold level value
- C. single threshold level value
- D. single threshold level range
Answer: C
Explanation:
Explanation
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjs/update-project-performance-d Performance Status Indicator Performance status indicators give an immediate picture ofthe status of a project, such as critical, at risk, and on track. Each distinct icon indicates the status and severity of performance. During KPI definition, you first associate status indicators with performance statuses:
* Critical
* Severe
* At risk
* On track
* Ahead
You then associate these statuses with threshold levels. When KPI values are generated for a project, each value is compared to the defined thresholds and the corresponding status indicator for the KPI appears on project performance reports.
A statuscan identify negative performance so that you can take the appropriate actions to prevent or quickly resolve problems. Conversely, a status can identify positive performance to help you track expected or excellent performance.
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/fapfm/implementing-project-financial-m Create Key Performance Indicators Create key performance indicators (KPI) to measure how well your organization performs an operational, tactical, or strategic activity that is critical for the current and future success ofthe organization.
Note: To create KPIs you must enable a project unit to track key performance indicators.
Use the Threshold Levels section to specify thresholds to indicate the health status of a KPI. Select one of the following options:
* Multiple threshold levels
* Single threshold level value
* Single threshold level range
NEW QUESTION 38
......