
[Sep-2023] 5V0-35.21 Dumps are Available for Instant Access from Prep4SureReview
Study resources for the Valid 5V0-35.21 Braindumps!
NEW QUESTION # 32
Which three key benefits does vRealize Operations provide within an environment? (Choose three.)
- A. Monitoring and troubleshooting
- B. Infrastructure orchestration
- C. Capacity optimization
- D. Provides self-service portal
- E. Service catalog for end users
- F. Performance optimization
Answer: A,C,F
NEW QUESTION # 33
An administrator is using the troubleshooting workbench in vRealize Operations for troubleshooting purposes.
Which other vRealize Suite product's data will be shown in this view when the integration is configured?
- A. vRealize Automation
- B. vRealize AI Cloud
- C. vRealize Network Insight
- D. vRealize Log Insight
Answer: C
NEW QUESTION # 34
An administrator is planning the size of a new vRealize Operations Manager (vROps) platform using the vROps sizing tool. The output of different configurations and sizing information from the tool were modeled for internal design discussion.
Refer to the exhibit:
Which configuration was sized?
- A. Stretched Cluster
- B. Continuous Availability
- C. Fault Tolerance
- D. High Availability
Answer: A
NEW QUESTION # 35
An administrator deployed vRealize Operations and has been tasked with ensuring that the VMware SDDC remains compliant to the VMware vSphere Security Configuration Guide. The compliance benchmark is showing that the VMware SDDC is not completely compliant to the standards.
Which three symptoms could have triggered a compliance alert? (Choose three.)
- A. The Enable 3D Support setting for the Virtual Machine is set to FALSE.
- B. The Disable console copy operation for a Virtual Machine is set to FALSE.
- C. The SNMP service on a vSphere ESXi host is set to Disabled.
- D. The Forged Transmit policy is set to allow on a Distributed Port Group.
- E. Transparent Page Sharing is Disabled on a virtual machine.
- F. The lockdown mode on a vSphere ESXi host is set to Disabled.
Answer: C,D,F
NEW QUESTION # 36
A customer is running a 4-node cluster for their Windows and Linux workloads. To keep the licensing costs at a minimum, the customer only licensed two nodes for Windows and two nodes for Linux within the cluster.
Now, the administrator needs to ensure the workloads only run on their assigned nodes.
What should an administrator configure to achieve this goal?
- A. Operational Intent - Clusters
- B. Business Intent - Hosts
- C. Operational Intent - Hosts
- D. Business Intent - Clusters
Answer: C
NEW QUESTION # 37
An administrator has been using the troubleshooting workbench feature to identify an issue with a virtual machine and configured the specified time range and scope in the active session.
When returning to the troubleshooting workbench the following day, the administrator can see the Virtual Machine context as a recent search. Upon opening this object, though, the changes made the previous day are no longer visible.
What is the cause of this issue?
- A. The product needs to be licensed with vRealize Operations Enterprise edition.
- B. The administrator did not click the Save option when using the troubleshooting workbench.
- C. Changes made to scope, time, or potential evidence are not saved after logging out.
- D. The vRealize Operations instance has been restored from an earlier backup.
Answer: C
NEW QUESTION # 38
While creating a What-If Analysis to compare datacenters, the administrator would like to simulate 25% utilization of the resources.
Which workload option should be included in the scenario?
- A. Expected Utilization
- B. Memory
- C. Annual Projected Growth
- D. CPU
Answer: A
NEW QUESTION # 39
An administrator discovered a problem in the virtual infrastructure and obtained instructions that would resolve the triggered alert.
Which alert component was used by the administrator?
- A. Reclamation
- B. Recommendation
- C. Symptom
- D. Threshold
Answer: B
NEW QUESTION # 40
An administrator has enabled the allocation model in a policy and set the CPU overcommit ratio to 4:1 for all vSphere clusters in a vSphere datacenter.
Why would vRealize Operations report that the cluster has 0 days remaining when the actual CPU overcommit ratio is less than the 4:1 configured value?
- A. The allocation model will always report zero remaining capacity when the actual ratio is less than the configured ratio.
- B. The CPU demand in the cluster is greater than the total CPU capacity.
- C. The CPU demand in the cluster is less than the total CPU capacity.
- D. The allocation model does not account for powered off virtual machines.
Answer: B
NEW QUESTION # 41
An administrator is using vRealize Operations for capacity modeling to determine how many moreESXi servers are needed to increase time remaining and capacity remaining score.
What can be used to accomplish this goal?
- A. Workload Optimization
- B. Rightsizing
- C. What-If Analysis
- D. Operations Overview
Answer: C
NEW QUESTION # 42
What is the minimum number of fault domains required to achieve vRealize Operations continuous availability with a primary node, data node, and witness node?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION # 43
A company has just acquired a competitor with a vSphere environment and would like to have the new vSphere environment also monitored by the company's original three-node vRealize Operations cluster. The vRealize Operations Sizing tool determines two additional data node, and a remote collector needs to be added to the vRealize Operations cluster.
The nodes are deployed accordingly, and the administrator now needs to create a trust relationship between the cluster and each of these new nodes.
Which two methods will meet this goal? (Choose two.)
- A. Use the vRealize Operations root user name and password when prompted in each new node.
- B. Generate passphrases in the administration User Interface of an existing node, and enter them when prompted in each new node.
- C. Click the Add New Nodes button on the System Status page in the administration User Interface of an existing node.
- D. Click the Add New Nodes button on the Cluster Management page in the product User Interface of an existing node.
- E. Use any local or directory user with the Administrator role in vRealize Operations when prompted in each new node.
Answer: B,D
NEW QUESTION # 44
Which cloud provider needs to be added as a custom cloud provider when running a What-If Analysis?
- A. IBM Cloud
- B. Oracle Cloud
- C. Google Cloud
- D. Microsoft Azure
Answer: B
NEW QUESTION # 45
A system administrator creates a common catalog to be used by all customers. For availability purposes, the catalog will be consumed by a different VMware Cloud Director instance in a different country.
Which catalog setting enables the catalog to be shared across VMware Cloud Director instances?
- A. Subscribed catalog
- B. Published catalog
- C. Content library catalog
- D. Shared catalog
Answer: D
Explanation:
Explanation
https://www.vmware.com/content/dam/digitalmarketing/vmware/en/pdf/vcat/vmware-architecting-a-vcloud-dire (67)
NEW QUESTION # 46
An administrator has deployed a vRealize Operations (vROps) cluster in a Continuous Availability configuration across the two racks in two fault domains. Following a network outage that occurred for several minutes, the administrator has been tasked to ensure that the vROps deployment is still healthy. They have noted that one cluster can still contact the witness node.
Which two events will occur as a result of the outage? (Choose two.)
- A. The administrator will need to bring the other fault domain online manually.
- B. One fault domain will go offline.
- C. The administrator will need to restart and resync the vROps cluster.
- D. Both fault domains will be offline.
- E. The vROps cluster will bring the fault domain back automatically once the network has been restored.
Answer: B,E
NEW QUESTION # 47
Which step is required before a Super Metric's data collection may begin?
- A. Enable in Objects
- B. Enable in Object Types
- C. Enable in Policy
- D. Enable in Alerts
Answer: B
NEW QUESTION # 48
An administrator is using vRealize Operations Cloud and needs to create a one-way communication to the on-premises environment.
Which appliance is needed to achieve this goal?
- A. Cloud Proxy
- B. VMware Proxy
- C. Web Proxy
- D. Reverse Proxy
Answer: C
NEW QUESTION # 49
An administrator has an existing vRealize Operations instance that monitors an existing vSphere infrastructure. The company has just deployed NSX-T across all hosts managed within this vSphere infrastructure.
The administrator has been asked to configure vRealize Operations to monitor the new NSX-T installation.
Which action should the administrator take to accomplish this goal?
- A. Configure NSX-T monitoring under the Cloud Account of the existing vCenter Server of the vSphere infrastructure.
- B. Add NSX-T account under Other Accounts.
- C. Add NSX-T account under Cloud Accounts.
- D. Configure NSX-T account in Integrations.
Answer: D
NEW QUESTION # 50
For the past 12 hours, a vRealize Operations Cluster has exhibited erratic behavior, and the remote collectors appear to be the cause. The administrator has contacted VMware support, and they have requested all relevant logs.
Because of bandwidth constraints, the customer will only be able to send the minimum amount of information to VMware support.
Which support bundle should the customer send that fits these constraints?
- A. Light-support bundle from the Primary nodes only
- B. Full-support bundle from the Primary nodes only
- C. Full-support bundle from all nodes
- D. Light-support bundle from all nodes
Answer: A
NEW QUESTION # 51
An administrator is asked to onboard an on-premises vCenter instance into an existing vRealize Operations Cloud instance.
Which two steps are needed to accomplish this goal? (Choose two.)
- A. Deploy and configure a Data node.
- B. Deploy and configure a cloud proxy.
- C. Add a vRealize Operations Cloud account.
- D. Deploy and configure a Primary node.
- E. Add a vCenter cloud account.
Answer: B,E
NEW QUESTION # 52
Which two additional parameters are taken into account when sizing a vRealize Operations cluster using the sizing tool? (Choose two.)
- A. Node size
- B. Projected Growth
- C. Number of current users
- D. Number of nodes
- E. Time Series Data Retention
Answer: B,E
NEW QUESTION # 53
An administrator has been tasked with configuring vRealize Operations to ensure that workload performance across the VMware SDDC is the main priority. In the event of an issue, remediation activities should be automatically completed to minimize any impact to running workloads. A maximum of 10% cluster resources should be reserved for burst capacity.
Which option should the administrator configure to meet these requirements?
- A. Business Intent
- B. Rightsizing
- C. Reclamation
- D. Operational Intent
Answer: A
NEW QUESTION # 54
......
VMware has evolved over time to become a renowned provider of virtualization technologies globally. Their certification programs are some of the most credible in the industry, and individuals aspiring to boost their knowledge and skills usually opt for these programs. One of the offerings is the VMware 5V0-35.21 Exam, which is an accreditation in VMware vRealize Operations Specialist. VMware vRealize Operations Specialist certification program is designed to equip learners with the essential skills necessary to manage and operate vRealize Operations in a virtual infrastructure.
Updated 5V0-35.21 Tests Engine pdf - All Free Dumps Guaranteed: https://dumpstorrent.prep4surereview.com/5V0-35.21-latest-braindumps.html
