Sample Questions of C_P2W43_2023 Dumps With 100% Exam Passing Guarantee Pass Key features of C_P2W43_2023 Course with Updated 82 Questions NEW QUESTION # 46 What is the goal of embedded analytics in SAP S/4HANA? A. To allow both tactical and strategic analyses within the S/4HANA core B. To integrate BW Info Cubes C. To integrate BW Data Store Objects D. To combine transactional and analytical processing [...]

Sample Questions of C_P2W43_2023 Dumps With 100% Exam Passing Guarantee [Q46-Q67]

Share

Sample Questions of C_P2W43_2023 Dumps With 100% Exam Passing Guarantee

Pass Key features of C_P2W43_2023 Course with Updated 82 Questions

NEW QUESTION # 46
What is the goal of embedded analytics in SAP S/4HANA?

  • A. To allow both tactical and strategic analyses within the S/4HANA core
  • B. To integrate BW Info Cubes
  • C. To integrate BW Data Store Objects
  • D. To combine transactional and analytical processing

Answer: D


NEW QUESTION # 47
The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

  • A. A purchase requisition will ALWAYS be created as soon as the order is saved.
  • B. A goods receipt can be posted after the maintenance order is technically completed.
  • C. A purchase order is created automatically as soon as the order is saved.
  • D. The maintenance order can be set to TECO before the invoice is created
  • E. A purchase requisition can be created automatically as soon as the order is saved.

Answer: A,D,E


NEW QUESTION # 48
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.

  • A. SAP Lumira
  • B. SAP Crystal Reports
  • C. Plant Maintenance Information Systems (PMIS)
  • D. SAP Quick Viewer

Answer: A,B


NEW QUESTION # 49
You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

  • A. Scheduling indicator
  • B. Maintenance package offset
  • C. Cycle modification factor
  • D. Package hierarchy

Answer: B


NEW QUESTION # 50
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Change documents
  • B. Call object
  • C. Order type
  • D. Maintenance activity type
  • E. Completion data

Answer: A,B,E


NEW QUESTION # 51
You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.

  • A. The effective costs are posted to the respective batch (valuation type).
  • B. The goods receipt for the batch refurbished is posted with the value of the moving average price
  • C. The effective costs are posted as a credit memo to a price difference account
  • D. The goods receipt for the batch refurbished is posted with the value of the standard price.

Answer: C,D


NEW QUESTION # 52
What do you have to consider when setting up the refurbishment process?

  • A. Mark the order type for refurbishment in customizing.
  • B. Assign valuation type C to the order type.
  • C. Assign a view profile for refurbishment to the order type.
  • D. Assign a stock determination rule to the PM order type

Answer: A


NEW QUESTION # 53
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

  • A. The controller can determine actual cost surcharges.
  • B. Goods receipts for external services can be entered.
  • C. The assignment of the notification to the maintenance order header cannot be deleted.
  • D. The planner can change estimated costs only at the header level
  • E. The planner can change planned costs at the operation level

Answer: A,B,E


NEW QUESTION # 54
A Task List contains two operations: Every 3 MON: pump inspection Every 24 MON. pump replacement When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?

  • A. Set the lead float
  • B. Create a cycle set sequence
  • C. Assign different hierarchy levels
  • D. Create a task list hierarchy

Answer: C


NEW QUESTION # 55
How does a performance-based maintenance plan calculate the interval between start date and planned date?

  • A. Cycle length divided by (monthly performance x 12)
  • B. Cycle length divided by annual performance
  • C. Cycle length divided by (annual performance/365)
  • D. Cycle length divided by ((scheduling period) x (cycle modification factor))

Answer: B


NEW QUESTION # 56
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.

  • A. Schedule and dispatch maintenance operations by shifts.
  • B. Dispatch maintenance order operations
  • C. Monitor maintenance order operations due in the next 4 weeks
  • D. Print job papers from a maintenance order.

Answer: B,C


NEW QUESTION # 57
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question

  • A. Maintain a serial number for an existing equipment master.
  • B. Assign a serial number profile to the equipment category
  • C. Assign a serial number profile to an additional business view for equipment category
  • D. Assign a serial number profile to the related material master.
  • E. Add a serialized material to the equipment serial data view.

Answer: B,D,E


NEW QUESTION # 58
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct answers to this question?

  • A. A task in the notification item
  • B. An entry in the object list
  • C. A text in the subject long text screen
  • D. An activity in the notification header

Answer: A,D


NEW QUESTION # 59
Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?

  • A. Serial data
  • B. Configuration
  • C. Manufacturer data
  • D. Warranty

Answer: C,D


NEW QUESTION # 60
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question

  • A. If you use the Resource Scheduling apps, you always dispatch orders and operations.
  • B. The order moves to the Preparation phase once it is approved and released
  • C. The configuration of the order type decides whether you use Resource Scheduling or not.
  • D. Maintenance Planning Buckets give you a list of non-approved notifications

Answer: A,B


NEW QUESTION # 61
What do you need to configure to enable entries in the action log of a piece of equipment?

  • A. Define the corresponding history related field for the equipment reference category.
  • B. Define history related fields in the usage period customizing.
  • C. Activate the change documents for the equipment reference category.
  • D. Activate the change documents for the equipment category.

Answer: B,D


NEW QUESTION # 62
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question

  • A. Warranty category
  • B. Status profile
  • C. Usage period
  • D. Measuring point category
  • E. Object information

Answer: B,D,E


NEW QUESTION # 63
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question

  • A. Only one cause of damage
  • B. Only one object part
  • C. One or more causes of damage.
  • D. One or more object parts

Answer: C,D


NEW QUESTION # 64
To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?

  • A. Maintenance plan
  • B. Work center
  • C. Business partner
  • D. Planner group

Answer: B,C


NEW QUESTION # 65
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

  • A. SAP S/4HANA Core Data Services
  • B. SAP Predictive Analysis
  • C. SAP Lumira Designer
  • D. SAP Asset Strategy and Performance Management

Answer: A


NEW QUESTION # 66
How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?

  • A. It is mandatory to assign a task list to the maintenance request.
  • B. It always uses the risk-based assessment for prioritization.
  • C. It is a new business object with no connection to a maintenance notification.
  • D. It contains an additional screening phase where requests can be accepted or rejected.

Answer: D


NEW QUESTION # 67
......

C_P2W43_2023 Sample Practice Exam Questions 2026 Updated Verified: https://dumpstorrent.prep4surereview.com/C_P2W43_2023-latest-braindumps.html