Achive your Success with Latest AVIXA CTS-I Exam [Jun 02, 2026] The CTS-I Exam Test For Brief Preparation NEW QUESTION # 45 What is a ground loop?Response: A. A continuous isolation between receptacles and electrical circuits B. An electrically conductive area that has two or more ground reference connections C. An electrical connection between any grounded conductor and any non-current-carrying metal [...]

[Jun 02, 2026] Achive your Success with Latest AVIXA CTS-I Exam [Q45-Q66]

Share

Achive your Success with Latest AVIXA CTS-I Exam [Jun 02, 2026]

The CTS-I Exam Test For Brief Preparation 

NEW QUESTION # 45
What is a ground loop?
Response:

  • A. A continuous isolation between receptacles and electrical circuits
  • B. An electrically conductive area that has two or more ground reference connections
  • C. An electrical connection between any grounded conductor and any non-current-carrying metal object
  • D. An interruption of a cable shield connection

Answer: B


NEW QUESTION # 46
The advantages of using a dual-channel FFT analyzer to adjust equalization include: (Choose all that apply.)

  • A. being less complicated than the RTA method
  • B. the ability to be optimized for different types of music
  • C. viewing the sound spectrum in both the frequency and time domain
  • D. identifying reflections in the room and isolating only the signals you want to measure

Answer: C,D


NEW QUESTION # 47
What type of drawing view shows the layout of items on the ceiling?

  • A. Elevation drawing
  • B. Reflected floor plan
  • C. Reflected ceiling plan
  • D. Detail ceiling drawing

Answer: C


NEW QUESTION # 48
Which of the following tasks would not be included in a preventive maintenance program? (Choose all that apply.)

  • A. Testing the failover systems for redundant spare equipment
  • B. Checking the equalization and gain structure on the audio replay system
  • C. Changing the preset frequencies on the handheld radio system
  • D. Checking the batteries in uninterruptable power supply systems

Answer: B,C


NEW QUESTION # 49
The connector pictured below is known as:

Response:

  • A. Direct connection termination
  • B. Captive screw compression termination
  • C. Insulation displacement
  • D. Ancillary dimpled solder connection

Answer: B


NEW QUESTION # 50
Which of the following must the as-built drawings show?
Response:

  • A. The client's vision for the finished system
  • B. Original system design specification
  • C. Details of the system as finally installed
  • D. Mechanical drawings

Answer: C


NEW QUESTION # 51
What is a macro?
Response:

  • A. A single function activated by a switch
  • B. A function activated by a button
  • C. A set or sequence of functions activated by a button
  • D. Multiple functions activated by separate buttons

Answer: C


NEW QUESTION # 52
HDCP is capable of working over which of the following interfaces? (Choose all that apply.)

  • A. HDBaseT
  • B. MHL
  • C. HDMI
  • D. DisplayPort

Answer: A,B,C,D


NEW QUESTION # 53
A limitation of using the RTA method to adjust equalization is:

  • A. that it cannot differentiate between high and low frequencies
  • B. that it cannot differentiate between the direct loudspeaker sound and the interference from combined direct and reflected energy
  • C. that an RTA is not available as a smartphone app, as computer software, or as dedicated hardware
  • D. that it is not legal in some jurisdictions

Answer: B


NEW QUESTION # 54
Which are best-practice methods for dressing a rack?
Select all that apply.
Response:

  • A. Secure heavy cable bundles to lacing bars.
  • B. Keep power cords separate from signal cables.
  • C. Bundle cables by signal type.
  • D. Use removable cable ties to secure a cable bundle.

Answer: A,B,C,D


NEW QUESTION # 55
Which document lists out the specific materials needed for an AV installation?

  • A. Presubmittal documents
  • B. As Built drawings
  • C. Architectural drawings
  • D. Bill of Materials

Answer: D


NEW QUESTION # 56
Where are Blu-ray players typically housed inside of AV racks?

  • A. In the very back of the rack
  • B. Near the top of the rack
  • C. At eye-level
  • D. At the bottom of the rack

Answer: C


NEW QUESTION # 57
A "just noticeable" change in sound pressure level, either louder or softer, requires a _____ change.

  • A. +/-6 dB
  • B. +/-3 dB
  • C. +/-1 dB
  • D. +/-10 dB

Answer: B


NEW QUESTION # 58
Which of the following are associated with sound pressure levels? (Choose all that apply.)

  • A. Is the ultimate method for quantifying background noise levels
  • B. Eliminates distortion in speech reinforcement
  • C. Can most accurately be measured with a Class 1 precision SPL meter
  • D. Is typically measured in decibels (dB SPL)

Answer: C,D


NEW QUESTION # 59
Which of the following are HDCP authentication steps? (Choose all that apply.)

  • A. Audio and video sync check
  • B. Session exchange
  • C. Key exchange
  • D. Locality check

Answer: B,C,D


NEW QUESTION # 60
Which symbol helps an AV professional find their way around a construction site?

  • A. Section Cut Flags
  • B. Column Lines
  • C. Match Lines
  • D. Elevation Flags

Answer: B


NEW QUESTION # 61
For what reasons is it important to set system gain?
Select all that apply.
Response:

  • A. To maximize S/N ratio
  • B. To minimize the gain structure
  • C. To minimize distortion
  • D. To maximize clipping

Answer: A,C


NEW QUESTION # 62
What type of fiber termination has an insert and twist connection?

  • A. ST
  • B. Hermaphroditic
  • C. LC
  • D. BNC

Answer: A


NEW QUESTION # 63
When powering a system off, which device from the following list should you turn off first?

  • A. Wireless mic receivers
  • B. Pre-amplifiers
  • C. Blu-ray players
  • D. Power amplifiers

Answer: D


NEW QUESTION # 64
Which device is used to verify signal integrity throughout a video system?
Response:

  • A. A Video Optimization meter (VOM)
  • B. A volt meter to check resistance
  • C. An impedance meter
  • D. An oscilloscope

Answer: C


NEW QUESTION # 65
What method can a technician use onsite to verify that the AV device is set to the proper IP address?
Response:

  • A. Use a USB connection to the CPU and the HyperTerminal program
  • B. Use an S-video hook up on a DVD drive and the Mac program
  • C. Connect directly to the CPU using an XLR connector and the Ping program
  • D. Use a DVI-D connector and dial in on a phone device

Answer: A


NEW QUESTION # 66
......


AVIXA CTS-I - Installation Exam Syllabus Topics:

TopicWeight
Duty A: Conducting Pre-Installation Activities20%
Task 1: Review Audiovisual Project Documentation4%
Task 2: Conduct Technical Site Survey4%
Task 3: Prepare for Audiovisual Installation4%
Task 4: Evaluate Overall Facility Readiness4%
Task 5: Conduct On-Site Preparations for Installation4%
Duty B: Conducting Site Rough-In/First-Fix10%
Task 1: Deinstallation of Existing Equipment and cabling2%
Task 2: Mount Substructure4%
Task 3: Pull Cable4%
Duty C: Installing Audiovisual Systems38%
Task 1: Assemble AV Rack4%
Task 2: Wire the AV Equipment Rack5%
Task 3: Distribute AV Equipment4%
Task 4: Mount AV Equipment4%
Task 5: Terminate Cables5%
Task 6: Configure Network Properties of Equipment4%
Task 7: Load Configuration and Control Programs4%
Task 8: Test the AV System4%
Task 9: Calibrate the AV System4%
Duty D: Perform Systems Close Out11%
Task 1: Demonstrate to Client or Client's Representative that System Performs to Specifications4%
Task 2:Provide Training on System Operation4%

 